1. Application Description 1) Service Description The base station commissioning indicates that the users commission and verify the base. OptiX RTN Radio Transmission System. VRC Commissioning and Configuration Guide (Web LCT). Issue, Date, HUAWEI. Huawei DBS Commissioning Procedure Security Level: Huawei DBS Commissioning Procedure (V) HUAWEI Confidential Page1.

Author: Kagalkree Mazragore
Country: Croatia
Language: English (Spanish)
Genre: Health and Food
Published (Last): 25 November 2011
Pages: 247
PDF File Size: 8.20 Mb
ePub File Size: 10.18 Mb
ISBN: 700-2-69844-203-7
Downloads: 35704
Price: Free* [*Free Regsitration Required]
Uploader: Maujar

Skip to main content. Call tests should consist of the following: The cmmissioning of this process are not covered in this document and is only included for informational purposes. To finalize the commissioning of the NodeB and make it ready for call testing it is necessary to notify the RNC engineer that the software upgrade and the commissioning is complete.

If the RNC engineer is not able to provide the necessary support the local engineer will need to contact Huawei technical support.

After commissiobing upgrade the software is complete, system will automatically reset NodeB, this will take about 5 minutes. If the some of the commands failed, please call RNC Engineer for troubleshooting.

Click the […] button on the Office row. Initiate the internet connection and make sure connection is set up. Click Add and Fill the table. Call RNC Engineer to block all cells.

Site Installation Checks Before the engineer begins the commissioning of the base station they will be required to carry out an audit of the installation quality.

Then double-click Data Config File Transfer. If required the engineer may have to remain off site until tower crews have comimssioning any ongoing operations.

To learn more about the commissioning scenarios and base station to be commissioned, refer to the corresponding chapters in the commissioning guide. This file will become part of the site documentation package. The engineer will btd to resolve or account for any active alarms on the NodeB with the assistance of the RNC engineers and Huawei technical support.

  EMILIA PARDO BAZAN LA TRIBUNA PDF

The DBS will carry out a reset after the software and the data configuration has been activated.

RTN 950 V100R003C01 Commissioning and Configuration Guide 02(Web LCT)

Sub-contractor team got the correct Huaeei software and Script from Huawei. If it is not the right version, please do Item 10 Local Commissioning again. Click here to sign up. Set the IP address for laptop.

Input the User Name: Once the downloading of the software and configuration to the Juawei begins the following should be occurring: For different base station commissioning scenarios, the following methods can be used: Group Post User Document.

Return New post Share. Please wait minutes. Application Description 1 Service Description The base station commissioning indicates that the users commission and verify the base station based on design requirements to ensure that the base station can work properly. The base station to be deployed has been configured.

Micro Base Station Commissioning Guide

You need set IP Address is After you finish the call test, please call RNC Engineer to unblock cells and block cells, you can make calls and Handover After you finish the callp, please call RNC Engineer to unblock all cells and tell them the Callp on site finished.

The Upgrade NodeB software dialog box will not be displayed. The full reset will take about 5 minutes. Site Awareness There are a number of site in Canada that are in remote location that require situational awareness therefore when travelling to and from remote site locations it is important that the engineer is equipped for travel to remote sites Engineers must also be aware that Tower work takes precedent over any other site work; therefore if tower work is in progress then the tower crew is in control of the site.

  ABNT NBR 10844 PDF

A valid Huawei ID card will be required for all engineers attending site.

Micro Base Station Commissioning Guide-Wireless Network Info Community-Huawei Connect

The document will provide the required tools, contacts and procedures to be followed. Scope The scope of this document is to give a detail procedure for the commissioning of the Huawei DBS base station. Save it and send all these three files to Huawei. The hardware has been installed.

Check the download speed 4. Site Access Procedures On attending site the engineer will be required to follow the site access procedures laid out below. Then double-click Software Update, as before.

Once you are logged in successfully you should see the following. From this report a forecasting schedule will then be produced to initiate the site configuration data to be prepared and the scheduling of engineers to attend site for commissioning. Different base stations use different commissioning tools. And then you can get the values in this XLS file.

The following section describes the checks required. Wireless Network Info Community Members: Make a PS download and walk around the site, to make sure there is no call drop. This procedure must happen all the time, every time.